Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
US 270 in Leflore County, Oklahoma, from the US 270-US 271 Junction and Extend East 6.0 Miles to Wister
The project begins at the US 270-US 271 junction west of Wister and extends east 6.0 miles to Wister on an alignment generally offset and contiguous to existing US 270 in LeFlore County. The project consists of developing a primary state highway on offset alignment to serve a corridor consisting mainly of thru traffic. Adverse environmental impacts arising from this project include the displacement of nine rural, single family dwellings, increased air and noise pollution along the proposed corridor, and slight potential for water pollution during construction of the bridges in the area.
US 270 in Leflore County, Oklahoma, from the US 270-US 271 Junction and Extend East 6.0 Miles to Wister
The project begins at the US 270-US 271 junction west of Wister and extends east 6.0 miles to Wister on an alignment generally offset and contiguous to existing US 270 in LeFlore County. The project consists of developing a primary state highway on offset alignment to serve a corridor consisting mainly of thru traffic. Adverse environmental impacts arising from this project include the displacement of nine rural, single family dwellings, increased air and noise pollution along the proposed corridor, and slight potential for water pollution during construction of the bridges in the area.
US 270 in Leflore County, Oklahoma, from the US 270-US 271 Junction and Extend East 6.0 Miles to Wister
1971
7 pages
Report
Keine Angabe
Englisch
Review of soils design construction, and performance observations, Wister dam, Oklahoma
Engineering Index Backfile | 1959