Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
National Program for Inspection of Non-Federal Dams. Milton Leather Board Dam (NH 00316), Piscataqua River Basin, Milton, New Hampshire. Phase I Inspection Report
The Milton Leather Board Dam is a mortar-laid stone masonry and concrete gravity dam founded on bedrock. The dam varies from about 2 ft. to about 32 ft. high, and is about 350 ft. long. Based on the visual inspection and reports of past operational performance, the dam is assessed to be in fair condition. Areas of major concern regarding the long-term safety of the dam include deterioration of the concrete dike section and the concrete stop log piers. It is small in size with a significant hazard potential.
National Program for Inspection of Non-Federal Dams. Milton Leather Board Dam (NH 00316), Piscataqua River Basin, Milton, New Hampshire. Phase I Inspection Report
The Milton Leather Board Dam is a mortar-laid stone masonry and concrete gravity dam founded on bedrock. The dam varies from about 2 ft. to about 32 ft. high, and is about 350 ft. long. Based on the visual inspection and reports of past operational performance, the dam is assessed to be in fair condition. Areas of major concern regarding the long-term safety of the dam include deterioration of the concrete dike section and the concrete stop log piers. It is small in size with a significant hazard potential.
National Program for Inspection of Non-Federal Dams. Milton Leather Board Dam (NH 00316), Piscataqua River Basin, Milton, New Hampshire. Phase I Inspection Report
1979
81 pages
Report
Keine Angabe
Englisch