Cement grouting in the foundation of the Toktogul'sk hydroelectric station dam
Conclusions 1. Strengthening grouting in rocks with intense decompression fractures consolidates the rock so that it will support a high (215 m) dam. 2. Drilling of grouting holes in the reinforced concrete of the surcharging layer of the dam requires special drilling equipment. 3. Under conditions similar to the Toktogul'sk station, a separate method of preparing the master grout in the GPU and working grout in the GIU with volume proportioning in the latter and pneumatic transport from the GIU is economically rational and technologically feasible.
Cement grouting in the foundation of the Toktogul'sk hydroelectric station dam
Conclusions 1. Strengthening grouting in rocks with intense decompression fractures consolidates the rock so that it will support a high (215 m) dam. 2. Drilling of grouting holes in the reinforced concrete of the surcharging layer of the dam requires special drilling equipment. 3. Under conditions similar to the Toktogul'sk station, a separate method of preparing the master grout in the GPU and working grout in the GIU with volume proportioning in the latter and pneumatic transport from the GIU is economically rational and technologically feasible.
Cement grouting in the foundation of the Toktogul'sk hydroelectric station dam
Olennikov, N. F. (Autor:in) / Chernysh, V. I. (Autor:in)
Hydrotechnical Construction ; 7 ; 1024-1027
01.11.1973
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Cement grouting in the foundation of the Toktogul'sk hydroelectric station dam
Online Contents | 1973
|Foundation grouting at the Chirkey hydroelectric station dam
Online Contents | 1976
|Characteristics of horizontal construction joints at the Toktogul'sk hydroelectric plant
Springer Verlag | 1973
|Foundation grouting at the Chirkey hydroelectric station dam
Springer Verlag | 1976
|