A platform for research: civil engineering, architecture and urbanism
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The length of the stripping time of the diversion tunnel concrete lining of hydropower station will affect construction speed of the lining and increase the project cost. In combination with the actual situation of derivation tunnel in ASAHAN NO.1 hydropower station project, and using concrete strength test and mathematical model calculation, this article explores the proper stripping time of side and roof arch steel trolley.
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The length of the stripping time of the diversion tunnel concrete lining of hydropower station will affect construction speed of the lining and increase the project cost. In combination with the actual situation of derivation tunnel in ASAHAN NO.1 hydropower station project, and using concrete strength test and mathematical model calculation, this article explores the proper stripping time of side and roof arch steel trolley.
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
Applied Mechanics and Materials ; 212-213 ; 815-820
2012-10-26
6 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2012
|Indonesia's Asahan hydro project
Tema Archive | 1983
|Indonesia's Asahan hydro project. II
Tema Archive | 1983
|TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
European Patent Office | 2017
|