A platform for research: civil engineering, architecture and urbanism
Suspension bridge solves problem of crossing Rio Chiriqui in Panama
Highway crossing requires span of 410 feet. (1000 w.) (79014)
Suspension bridge solves problem of crossing Rio Chiriqui in Panama
Highway crossing requires span of 410 feet. (1000 w.) (79014)
Suspension bridge solves problem of crossing Rio Chiriqui in Panama
Eng News-Rec
Zinn, A.S. (author)
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Simple expedient solves problem in bridge erection
Engineering Index Backfile | 1928
|Bridging Rio Chiriqui on Pan-American highway
Engineering Index Backfile | 1936
|First crossing problem for a suspension bridge being fatigue-degraded
British Library Conference Proceedings | 1995
|