A platform for research: civil engineering, architecture and urbanism
Construction of Three Kilometre Long HRT, Silt Flushing Tunnel, Surge and Pressure Shafts for Rangit Hydro Electric Project, Sikkim
Construction of Three Kilometre Long HRT, Silt Flushing Tunnel, Surge and Pressure Shafts for Rangit Hydro Electric Project, Sikkim
Construction of Three Kilometre Long HRT, Silt Flushing Tunnel, Surge and Pressure Shafts for Rangit Hydro Electric Project, Sikkim
Conference, Tunneling Asia ; 1997 ; New Delhi
1997-01-01
6 pages
See also supplementary part containing special lectures
Conference paper
English
tunneling , irrigation , power
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 1997
|Construction of Three Large-Diameter Shafts for the South Cobb Tunnel Project
British Library Conference Proceedings | 2011
|