A platform for research: civil engineering, architecture and urbanism
Subway construction using the removable three-centered slurry shield method
Subway construction using the removable three-centered slurry shield method
Subway construction using the removable three-centered slurry shield method
Matsuda, T. (author) / Yahagi, S. (author) / Ujiie, S. (author) / Ooishi, K. (author) / Alten, T. / Norwegian Tunnelling Society (NFF) / International Tunnelling Association
World tunnel congress, Vol 2; Communication tunnels; miscellaneous including water tunnels; mechanised tunnelling ; 1999 ; Oslo
1999-01-01
8 pages
Held during the 25th general assembly of the International Tunnelling Association
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 1994
|Behavior of subway tunnel driven by large slurry shield
British Library Conference Proceedings | 1995
|Shield construction method for subway underneath passing highway
European Patent Office | 2022
|Slurry wall construction for BART subway stations
Engineering Index Backfile | 1968
|The use of the shield in subway construction
Engineering Index Backfile | 1898
|