A platform for research: civil engineering, architecture and urbanism
Practising Modern and Innovative Tunnelling Techniques at 1020 MW Tala Hydroelectric Project in Bhutan Himalays
Practising Modern and Innovative Tunnelling Techniques at 1020 MW Tala Hydroelectric Project in Bhutan Himalays
Practising Modern and Innovative Tunnelling Techniques at 1020 MW Tala Hydroelectric Project in Bhutan Himalays
Dalal, R. B. (author) / Jha, R. K. (author) / Goyal, D. P. (author) / Gupta, K. K. (author) / Kaushish, S. P. / Ramamurthy, T. / Central Board of Irrigation and Power / International Society of Rock Mechanics
Workshop, Rock mechanics and tunnelling techniques ; 2001 ; Kathmandu, Nepal
Rock mechanics and tunnelling techniques ; 179-185
2001-01-01
7 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
1020 MW Tala Hydroelectric Project (Bhutan) - A Fast Track Construction Model
British Library Conference Proceedings | 2000
|Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
British Library Conference Proceedings | 2000
|Underground Tunnelling Works with Tala Hydroelectric Project Authority
British Library Conference Proceedings | 2000
|Control of alkali silica reaction at Tala Hydroelectric Project in Bhutan
British Library Conference Proceedings | 2006
|Quality Management of Power House Cavern at Tala Hydroelectric Project in Bhutan, Himalayas
British Library Conference Proceedings | 2003
|