A platform for research: civil engineering, architecture and urbanism
Quality Management of Power House Cavern at Tala Hydroelectric Project in Bhutan, Himalayas
Quality Management of Power House Cavern at Tala Hydroelectric Project in Bhutan, Himalayas
Quality Management of Power House Cavern at Tala Hydroelectric Project in Bhutan, Himalayas
Singh, R. (author) / Gupta, M. (author) / Sharma, B. N. (author) / Goyal, D. P. (author) / Khazanchi, R. N. (author) / Viladkar, M. N. / Indian Institute of Technology, Roorkee
Indian geotechnical conference; Geotechnical engineering for infrastructural development ; 2003 ; Roorkee, India
2003-01-01
4 pages
Also known as IGC 2003
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
1020 MW Tala Hydroelectric Project (Bhutan) - A Fast Track Construction Model
British Library Conference Proceedings | 2000
|Control of alkali silica reaction at Tala Hydroelectric Project in Bhutan
British Library Conference Proceedings | 2006
|Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
British Library Conference Proceedings | 2000
|British Library Conference Proceedings | 2001
|HYDRAULIC MODEL STUDIES FOR TALA DAM SPILLWAY, BHUTAN
Taylor & Francis Verlag | 2005
|