A platform for research: civil engineering, architecture and urbanism
Foundation Installation Requiring Recharging of Ground Water
Ground water, at the site described herein, provided partial support, through buoyancy, for the five 14-story structures constructed. However, when the ground water was lowered to permit the new foundations to be installed in the dry, special precautions had to be taken to safeguard the adjacent existing structures. The soil conditions prevailing, the foundation treatment adopted, the proximity of existing adjacent structures, and the ground water conditions all have an important bearing on the requirements of the diffusion system described herein. This system was developed to maintain normal ground water levels in the adjacent areas during the construction period.
Foundation Installation Requiring Recharging of Ground Water
Ground water, at the site described herein, provided partial support, through buoyancy, for the five 14-story structures constructed. However, when the ground water was lowered to permit the new foundations to be installed in the dry, special precautions had to be taken to safeguard the adjacent existing structures. The soil conditions prevailing, the foundation treatment adopted, the proximity of existing adjacent structures, and the ground water conditions all have an important bearing on the requirements of the diffusion system described herein. This system was developed to maintain normal ground water levels in the adjacent areas during the construction period.
Foundation Installation Requiring Recharging of Ground Water
Parsons, James D. (author)
Transactions of the American Society of Civil Engineers ; 126 ; 1199-1212
2021-01-01
141961-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Foundation installation requiring recharging of ground water
Engineering Index Backfile | 1959
|Foundation pit gushing water drainage and recharging construction method
European Patent Office | 2021
|Water-rich soft soil stratum foundation pit dewatering and recharging construction method
European Patent Office | 2024
|Water settling, spring protection and recharging integrated device for foundation pit engineering
European Patent Office | 2015
|