A platform for research: civil engineering, architecture and urbanism
Water settling, spring protection and recharging integrated device for foundation pit engineering
The invention discloses a water settling, spring protection and recharging integrated device for foundation pit engineering. The water settling, spring protection and recharging integrated device is characterized in that one end of a recharging water quality treatment system is connected with a water settling well, the other end of the recharging water quality treatment system is sequentially and serially connected with a water quality monitoring system, a pressurizing and water collecting system, a wellhead device and a recharging well, and the water quality of the sucked underground water is analyzed by the recharging water quality treatment system and the water quality monitoring system; when the recharging water quality requirement is met, the recharging water enters the pressurizing and water collecting system, and the water of the pressurizing and water collecting system enters the recharging well through the recharging wellhead device at fixed flow rate and fixed pressure; when the recharging water quality requirement is not met, the recharging water flows back to the recharging water quality treatment system, and the water quality is analyzed and treated again. The water settling, spring protection and recharging integrated device has the beneficial effects that by utilizing the underground water recharging technique, the stability of the underground water level near the construction area can be effectively controlled, the deformation of adjacent stratum is prevented, and the safety threat of construction on the neighboring residents is reduced.
Water settling, spring protection and recharging integrated device for foundation pit engineering
The invention discloses a water settling, spring protection and recharging integrated device for foundation pit engineering. The water settling, spring protection and recharging integrated device is characterized in that one end of a recharging water quality treatment system is connected with a water settling well, the other end of the recharging water quality treatment system is sequentially and serially connected with a water quality monitoring system, a pressurizing and water collecting system, a wellhead device and a recharging well, and the water quality of the sucked underground water is analyzed by the recharging water quality treatment system and the water quality monitoring system; when the recharging water quality requirement is met, the recharging water enters the pressurizing and water collecting system, and the water of the pressurizing and water collecting system enters the recharging well through the recharging wellhead device at fixed flow rate and fixed pressure; when the recharging water quality requirement is not met, the recharging water flows back to the recharging water quality treatment system, and the water quality is analyzed and treated again. The water settling, spring protection and recharging integrated device has the beneficial effects that by utilizing the underground water recharging technique, the stability of the underground water level near the construction area can be effectively controlled, the deformation of adjacent stratum is prevented, and the safety threat of construction on the neighboring residents is reduced.
Water settling, spring protection and recharging integrated device for foundation pit engineering
WANG GUOFU (author) / LU LINHAI (author) / ZENG CHUNPIN (author)
2015-05-06
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Quaternary micro-confined water spring protection type recharging well and method
European Patent Office | 2015
|Foundation installation requiring recharging of ground water
Engineering Index Backfile | 1959
|Foundation pit gushing water drainage and recharging construction method
European Patent Office | 2021
|