A platform for research: civil engineering, architecture and urbanism
Foundation installation requiring recharging of ground water
Construction of foundations for five 14-story buildings at Coney Island, New York; ground water at site required special precautions to be taken to safeguard adjacent existing structures, when lowered to permit new foundations to be installed in dry.
Foundation installation requiring recharging of ground water
Construction of foundations for five 14-story buildings at Coney Island, New York; ground water at site required special precautions to be taken to safeguard adjacent existing structures, when lowered to permit new foundations to be installed in dry.
Foundation installation requiring recharging of ground water
ASCE -- Proc (J Construction Div)
Parsons, J.D. (author)
1959
21 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Foundation pit gushing water drainage and recharging construction method
European Patent Office | 2021
|Water-rich soft soil stratum foundation pit dewatering and recharging construction method
European Patent Office | 2024
|Water settling, spring protection and recharging integrated device for foundation pit engineering
European Patent Office | 2015
|