A platform for research: civil engineering, architecture and urbanism
A Constructed Wetland for Stormwater Detention and Treatment in the Alligator Creek Watershed, Pinellas County, Florida
Pinellas County and the Southwest Florida Water Management District's Surface Water Improvement and Management (SWIM) Department have jointly funded a project to retrofit an urban drainage basin for stormwater attenuation and treatment. This paper presents unique design features along with an effective combination of public education and environmental awareness that can easily be applied to other projects.
A Constructed Wetland for Stormwater Detention and Treatment in the Alligator Creek Watershed, Pinellas County, Florida
Pinellas County and the Southwest Florida Water Management District's Surface Water Improvement and Management (SWIM) Department have jointly funded a project to retrofit an urban drainage basin for stormwater attenuation and treatment. This paper presents unique design features along with an effective combination of public education and environmental awareness that can easily be applied to other projects.
A Constructed Wetland for Stormwater Detention and Treatment in the Alligator Creek Watershed, Pinellas County, Florida
Guillory, Blake C. (author) / Macrina, JoAnn J. (author)
Wetlands Engineering and River Restoration Conference 1998 ; 1998 ; Denver, Colorado, United States
1998-12-09
Conference paper
Electronic Resource
English
Alligator Creek Channel 'H' Detention and Treatment Pond
British Library Conference Proceedings | 1993
|Interstate Route 75 in Pinellas County, Florida
NTIS | 1972
IMPLEMENTATION OF GEOTEXTILE T-GROINS IN PINELLAS COUNTY, FLORIDA
British Library Online Contents | 2007
|Interstate Route 75 in Pinellas County, Florida
NTIS | 1971