A platform for research: civil engineering, architecture and urbanism
Substructure of Piscataquis Bridge, and Analysis of Concrete Work
This paper gives a general description of the construction of the Piscataquis River Bridge, built for the Bangor and Aroostook Railroad, and also the results attained with the different classes of concrete used.
Substructure of Piscataquis Bridge, and Analysis of Concrete Work
This paper gives a general description of the construction of the Piscataquis River Bridge, built for the Bangor and Aroostook Railroad, and also the results attained with the different classes of concrete used.
Substructure of Piscataquis Bridge, and Analysis of Concrete Work
Hersey, G. A. (author)
Transactions of the American Society of Civil Engineers ; 61 ; 377-382
2021-01-01
61908-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Substructure of Piscataquis bridge, and analysis of concrete work
Engineering Index Backfile | 1908
|Bridge Substructure Concrete Deterioration
NTIS | 1991
|Bridge substructure concrete hydration heat release device
European Patent Office | 2022
|Bridge substructure concrete curing equipment and method
European Patent Office | 2024
|Substructure work and erection of the shubenacadie bridge
Engineering Index Backfile | 1904