A platform for research: civil engineering, architecture and urbanism
Power Drill
The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths of 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing.
Power Drill
The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths of 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing.
Power Drill
Felice, Conrad W. (author) / Brenniman, Henry (author)
Civil Engineering Magazine Archive ; 75 ; 64-71
2016-01-01
82005-01-01 pages
Article (Journal)
Electronic Resource
Unknown
British Library Online Contents | 2005
|Drill blank, method for manufacturing drill blank, drill, and method for manufacturing drill
European Patent Office | 2017
|