A platform for research: civil engineering, architecture and urbanism
Rogue River Bridge to Gold Beach, Oregon Coast Highway, Curry County, Oregon: final environmental impact statement and final section 4(f) evaluation
OR T/H53 .2R63 :final ; 62 ; Includes ill. and maps. ; "The alternative selected by the Oregon State Highway Division, after considering the public hearing input, and reviewing the Draft Environmental Impact Statement and other related data, is Build Alternative 2 (modified) with the Design Option, the Colvin Street Reconnection, and a new retaining wall option.In arriving at the decision of the Selected Alternative, the following information was considered: The Selected Alternative will best accomplish the project's goal of reducing traffic congestion, enhancing safety for the motorist, bicyclist, and pedestrian, and adequately serving the present and future traffic demands. By utilizing the modified Alternative 2 plan with the retaining wall option, the Selected Alternative will require less right-of-way acquisition, reduce the impact on natural vegetation, and avoid the impact on the wetlands and estuary. The Selected Alternative is consistent with the comprehensive plans for the City of Gold Beach and Curry County. The majority of the public hearing participants, the Citizens Advisory Committee, the City of Gold Beach, and Curry County favored the Selected Alternative." P. 1 [5]
Rogue River Bridge to Gold Beach, Oregon Coast Highway, Curry County, Oregon: final environmental impact statement and final section 4(f) evaluation
OR T/H53 .2R63 :final ; 62 ; Includes ill. and maps. ; "The alternative selected by the Oregon State Highway Division, after considering the public hearing input, and reviewing the Draft Environmental Impact Statement and other related data, is Build Alternative 2 (modified) with the Design Option, the Colvin Street Reconnection, and a new retaining wall option.In arriving at the decision of the Selected Alternative, the following information was considered: The Selected Alternative will best accomplish the project's goal of reducing traffic congestion, enhancing safety for the motorist, bicyclist, and pedestrian, and adequately serving the present and future traffic demands. By utilizing the modified Alternative 2 plan with the retaining wall option, the Selected Alternative will require less right-of-way acquisition, reduce the impact on natural vegetation, and avoid the impact on the wetlands and estuary. The Selected Alternative is consistent with the comprehensive plans for the City of Gold Beach and Curry County. The majority of the public hearing participants, the Citizens Advisory Committee, the City of Gold Beach, and Curry County favored the Selected Alternative." P. 1 [5]
Rogue River Bridge to Gold Beach, Oregon Coast Highway, Curry County, Oregon: final environmental impact statement and final section 4(f) evaluation
1988-01-01
Bioregion ; http://worldcatlibraries.org/wcpa/oclc/18388653
Miscellaneous
Electronic Resource
English
DDC:
710
Rogue river bridge at Gold Beach, Oregon
Engineering Index Backfile | 1931
|Rogue river bridge at Gold beach, Oregon
Engineering Index Backfile | 1932
|Rogue-Illinois plan: Josephine and Curry Counties, Oregon: revised draft environmental statement
BASE | 1978
|