A platform for research: civil engineering, architecture and urbanism
Prefabricated timber bridge replaces Maine Ferry
Illustrated account of construction of 3-span, 400-ft bridge across Allagash River, built with superstructure of pre-fabricated and treated Douglas fir, resting on rock filled crib piers and gravel filled abutments.
Prefabricated timber bridge replaces Maine Ferry
Illustrated account of construction of 3-span, 400-ft bridge across Allagash River, built with superstructure of pre-fabricated and treated Douglas fir, resting on rock filled crib piers and gravel filled abutments.
Prefabricated timber bridge replaces Maine Ferry
Construction Methods
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New bridge replaces car ferry on the Maine contral
Engineering Index Backfile | 1928
New bridge replaces last ferry in N.S.W. state highway system
Engineering Index Backfile | 1967
Composite replaces timber screens
British Library Online Contents | 2010
Steel and concrete deck replaces timber roadway on Eads bridge
Engineering Index Backfile | 1947
|Bridge replaces buried crossing
Engineering Index Backfile | 1964
|