A platform for research: civil engineering, architecture and urbanism
Reconstruction of Trystram lock at Dunkirk Harbor
Lock was completely demolished by Germans in Sept 1944 and had to be entirely rebuilt; principal features of civil engineering and steel work; improvements in new structure to simplify maintenance and operations; methods used in carrying out work. (English abstract) (See also - n 262 Aug 1956 p 441-6, n 263 Sept p 498-510, n 264 Oct p 533-44)
Reconstruction of Trystram lock at Dunkirk Harbor
Lock was completely demolished by Germans in Sept 1944 and had to be entirely rebuilt; principal features of civil engineering and steel work; improvements in new structure to simplify maintenance and operations; methods used in carrying out work. (English abstract) (See also - n 262 Aug 1956 p 441-6, n 263 Sept p 498-510, n 264 Oct p 533-44)
Reconstruction of Trystram lock at Dunkirk Harbor
La reconstruction de l'ecluse Trystram du port de Dunkerque
Malegarie, H. (author) / Radigue, R. (author) / Soulas, R. (author)
Travaux ; 40
1956
12 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of P.H. Watier lock at Dunkirk
Engineering Index Backfile | 1950
|Dunkirk-Valenciennes canal -- Pont-Malin lock
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1963
|Connection of Port of Dunkirk with large ship canal, and extension of harbor basin
Engineering Index Backfile | 1967
|Dunkirk harbour extension works
Engineering Index Backfile | 1938
|