A platform for research: civil engineering, architecture and urbanism
Reconstruction of Calder Bridge, L.N.E.R.
Notes on construction of old bridge, near Wakefield, built in 1865, consisting of cast iron arch reinforced with certain wrought iron members; method of removal of superstructure and replacement with segmental arch span on 69° skew; in each of three pairs of arched ribs there is lead of 1 ft 7 31/32 in. between ribs forming pair, and lead between adjacent pairs is 2 ft 6 2/3 in.; bridge will carry 20 units, BSI loading for railway bridge.
Reconstruction of Calder Bridge, L.N.E.R.
Notes on construction of old bridge, near Wakefield, built in 1865, consisting of cast iron arch reinforced with certain wrought iron members; method of removal of superstructure and replacement with segmental arch span on 69° skew; in each of three pairs of arched ribs there is lead of 1 ft 7 31/32 in. between ribs forming pair, and lead between adjacent pairs is 2 ft 6 2/3 in.; bridge will carry 20 units, BSI loading for railway bridge.
Reconstruction of Calder Bridge, L.N.E.R.
Ry Gaz
1939
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of superstructure of Wood Green Flyover Bridge, L.N.E.R.
Engineering Index Backfile | 1937
Partial reconstruction of Ely station, L.N.E.R.
Engineering Index Backfile | 1931
Engineering Index Backfile | 1932
Calder bridge design competition
Engineering Index Backfile | 1964
Design for Calder motorway bridge
Engineering Index Backfile | 1964