A platform for research: civil engineering, architecture and urbanism
Grade separation eliminates traffic hazards to shipyard workers
Details pertaining to Waldo grade separation of U S 101 and Marin City road; bridge is reinforced concrete slab structure, consisting of four 19-ft spans and one 13-ft span on concrete bents; it provides two 14-ft traffic lanes and 10-ft side walk beneath structure; deck accommodates 25-ft roadway to northbound traffic and 37-ft roadway for southbound traffic, separated by 4-ft curbed division strip.
Grade separation eliminates traffic hazards to shipyard workers
Details pertaining to Waldo grade separation of U S 101 and Marin City road; bridge is reinforced concrete slab structure, consisting of four 19-ft spans and one 13-ft span on concrete bents; it provides two 14-ft traffic lanes and 10-ft side walk beneath structure; deck accommodates 25-ft roadway to northbound traffic and 37-ft roadway for southbound traffic, separated by 4-ft curbed division strip.
Grade separation eliminates traffic hazards to shipyard workers
Calif Highways Pub Works
Rice, W.A. (author)
1943
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New tunnel eliminates seven grade crossings
Engineering Index Backfile | 1932
|Wawona highway tunnel eliminates inspiration point grade
Engineering Index Backfile | 1934
|Erie eliminates 15 grade crossings at Elmira, NY
Engineering Index Backfile | 1935
New express highway eliminates war traffic bottleneck
Engineering Index Backfile | 1943
|