A platform for research: civil engineering, architecture and urbanism
Planting bridge-pier work for efficient concreting
Design of concreting plant, including batchers and pavers, for construction of piers and abutments for two Cape Cod Canal bridges located 4 mi apart; total job of 70,000 cu yd concrete involved seal pours of 133 yd per hr and irregular and small pours thereafter; battery of five paving mixers discharged into bottom-dump buckets handled by four derricks and cranes. (See also - Eng News-Rec v 114 n 9 Feb 28 1935 p 305-8)
Planting bridge-pier work for efficient concreting
Design of concreting plant, including batchers and pavers, for construction of piers and abutments for two Cape Cod Canal bridges located 4 mi apart; total job of 70,000 cu yd concrete involved seal pours of 133 yd per hr and irregular and small pours thereafter; battery of five paving mixers discharged into bottom-dump buckets handled by four derricks and cranes. (See also - Eng News-Rec v 114 n 9 Feb 28 1935 p 305-8)
Planting bridge-pier work for efficient concreting
Gen Contractor's Assn -- Bul
1935
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
`Greenhouses' protected winter bridge concreting
Engineering Index Backfile | 1963
Engineering Index Backfile | 1919
Concreting deck for Glen Canyon bridge
Engineering Index Backfile | 1959