A platform for research: civil engineering, architecture and urbanism
Motorway-some years later
Discussion of problems of maintenance which have been experienced on Hertfordshire and Northamptonshire sections of London-Yorkshire Motorway M.1, M.10 and M.45; distribution of general arrangements for maintenance; survey of existing traffic, asphalt pavement repairs by 1 1/2-in. wearing course of hot rolled asphalt, and correction of spalling and cracks in concrete pavement; damaged shoulder areas were coated to depth of 2 to 3 in. with dense asphalt macadam; repairs of cuts and fills, improvement of drainage in median and general maintenance problems; grooving and rubber compounds were used for reducing skidding; timber dividers between lanes are provided.
Motorway-some years later
Discussion of problems of maintenance which have been experienced on Hertfordshire and Northamptonshire sections of London-Yorkshire Motorway M.1, M.10 and M.45; distribution of general arrangements for maintenance; survey of existing traffic, asphalt pavement repairs by 1 1/2-in. wearing course of hot rolled asphalt, and correction of spalling and cracks in concrete pavement; damaged shoulder areas were coated to depth of 2 to 3 in. with dense asphalt macadam; repairs of cuts and fills, improvement of drainage in median and general maintenance problems; grooving and rubber compounds were used for reducing skidding; timber dividers between lanes are provided.
Motorway-some years later
Instn Mun Engrs -- J
Leigh, J.V. (author) / Sanders, R.N. (author)
1966
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
M1 Motorway bridges - 40 years on
British Library Online Contents | 2001
|BRIDGES - M1 Motorway bridges -- 40 years on
Online Contents | 2001
|Engineering Index Backfile | 1966
|British Library Online Contents | 2014
|