A platform for research: civil engineering, architecture and urbanism
Colorado-Big Thompson project irrigates 600,000 acres, generates 600 million Kwhr
Construction features of project presented including: Granby Dam; reinforced concrete pumping plant equipped with 3 vertical shaft pumps, driven by 6000 hp motors; concrete lined Alva B. Adams Tunnel, 13.06 mi long with circular section 9175 ft in diam; Green Mountain reservoir with capacity of 147,000 acre ft; Granby reservoir with 468,000 acre ft and Horsetooth reservoir with 147,000 acre ft.
Colorado-Big Thompson project irrigates 600,000 acres, generates 600 million Kwhr
Construction features of project presented including: Granby Dam; reinforced concrete pumping plant equipped with 3 vertical shaft pumps, driven by 6000 hp motors; concrete lined Alva B. Adams Tunnel, 13.06 mi long with circular section 9175 ft in diam; Green Mountain reservoir with capacity of 147,000 acre ft; Granby reservoir with 468,000 acre ft and Horsetooth reservoir with 147,000 acre ft.
Colorado-Big Thompson project irrigates 600,000 acres, generates 600 million Kwhr
Civ Eng (NY)
McClellan, L.N. (author)
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado-Big Thompson project, Colorado
Engineering Index Backfile | 1938
|Colorado-Big Thompson project, Colorado
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1957
TIBKAT | 2011
|Transmission line construction, Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1941
|