A platform for research: civil engineering, architecture and urbanism
Utilization of head of Genissiat on upper Rhone river
Aggregates, concrete mixing plant, transport and placement of concrete; dam of concrete gravity type, 335.70 m high, 9 m wide at top; equipped with 90,000-hp Francis turbine and 65,000-kw alternator; three phase transformer 70,000 kva; total production 1.5 billion kw-hr per hr per yr; stored water 53 million cu m. (See also - n 10 May 15 1948 p 181-8; Revue Gene rale de l'Electricite v 32 n 2 Feb 1949 p 45-74)
Utilization of head of Genissiat on upper Rhone river
Aggregates, concrete mixing plant, transport and placement of concrete; dam of concrete gravity type, 335.70 m high, 9 m wide at top; equipped with 90,000-hp Francis turbine and 65,000-kw alternator; three phase transformer 70,000 kva; total production 1.5 billion kw-hr per hr per yr; stored water 53 million cu m. (See also - n 10 May 15 1948 p 181-8; Revue Gene rale de l'Electricite v 32 n 2 Feb 1949 p 45-74)
Utilization of head of Genissiat on upper Rhone river
Le barrage et l'usine generatrice de Genissiat
Delattre, P. (author) / Robert, A. (author)
Genie Civil ; 125
1948
7 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Utilization of head of Genissiat on upper Rhone river
Engineering Index Backfile | 1949
|Dam at Genissiat, France, and exploitation of Rhone Rive
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1938
Scouring and dredging at Génissiat
Online Contents | 1994
|Utilization of head of Donzere-Mondragon on Rhone river, France
Engineering Index Backfile | 1951
|