A platform for research: civil engineering, architecture and urbanism
Utilization of head of Genissiat on upper Rhone river
Aggregates, concrete mixing plant, transport and placement of concrete; dam of concrete gravity type, 335.70 m high, 9 m wide at top; equipped with 90,000-hp Francis turbine and 65,000-kw alternator; three phase transformer 70,000 kva; total production 1.5 billion kw-hr per hr per yr; stored water 53 million cu m. (see also Genie Civil v 125 n 10, 11, May 15 1948 p 181-8, June 1 p 201-7)
Utilization of head of Genissiat on upper Rhone river
Aggregates, concrete mixing plant, transport and placement of concrete; dam of concrete gravity type, 335.70 m high, 9 m wide at top; equipped with 90,000-hp Francis turbine and 65,000-kw alternator; three phase transformer 70,000 kva; total production 1.5 billion kw-hr per hr per yr; stored water 53 million cu m. (see also Genie Civil v 125 n 10, 11, May 15 1948 p 181-8, June 1 p 201-7)
Utilization of head of Genissiat on upper Rhone river
Le barrage et l'usine generatrice de Genissiat
Delattre, P. (author) / Robert, A. (author)
1949
30 pages
Maps, Section drawings, Photographs
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Dam at Genissiat, France, and exploitation of Rhone Rive
Engineering Index Backfile | 1947
|Utilization of head of Genissiat on upper Rhone river
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1938
Scouring and dredging at Génissiat
Online Contents | 1994
|Utilization of head of Donzere-Mondragon on Rhone river, France
Engineering Index Backfile | 1951
|