A platform for research: civil engineering, architecture and urbanism
Modernization of Brussels-Charleroi canal
Survey of preliminary subsoil studies, excavations, and foundation work on canal incline at Ronquiere; operation of water-filled 90×12×5 m high steel troughs carrying floating barges down and up incline is described.
Modernization of Brussels-Charleroi canal
Survey of preliminary subsoil studies, excavations, and foundation work on canal incline at Ronquiere; operation of water-filled 90×12×5 m high steel troughs carrying floating barges down and up incline is described.
Modernization of Brussels-Charleroi canal
Modernisation du canal Bruxelles-Charleroi
Construction ; 19
1964
6 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Engineering Index Backfile | 1948
|Extrusive rocks in Hasquempont trench, canal of Charleroi
Engineering Index Backfile | 1963
|I.N.A.S.E.P. - Régie des Eaux de Charleroi
Online Contents | 1997
Shelter and integration in Charleroi
British Library Conference Proceedings | 1993
|Die Hochstrasse in Charleroi fertiggestellt
Tema Archive | 1975
|