A platform for research: civil engineering, architecture and urbanism
City steam line tunneled beneath heavily traveled six-lane street
How main was extended under Cleveland's principal traffic artery to serve buildings on other side of avenue; pit 6.5 by 15 ft was excavated at curb line from which 3-ft diam tunnel was started to extend to manhole directly across street, distance of 82 ft; illustrated description. (See also Eng News-Rec v 140 n 22 May 27 1948 p 772-4)
City steam line tunneled beneath heavily traveled six-lane street
How main was extended under Cleveland's principal traffic artery to serve buildings on other side of avenue; pit 6.5 by 15 ft was excavated at curb line from which 3-ft diam tunnel was started to extend to manhole directly across street, distance of 82 ft; illustrated description. (See also Eng News-Rec v 140 n 22 May 27 1948 p 772-4)
City steam line tunneled beneath heavily traveled six-lane street
Heating Vent
Hamlin, G.W. (author)
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
City steam line tunneled beneath heavily traveled six-lane street
Engineering Index Backfile | 1948
|Reconstruction of old pavements on heavily traveled highways
Engineering Index Backfile | 1942
|Concrete and bituminous macadam used on heavily traveled road
Engineering Index Backfile | 1941
Heavily traveled New Mexico highway repaved with hot-mix asphaltic concrete
Engineering Index Backfile | 1951
|