A platform for research: civil engineering, architecture and urbanism
City steam line tunneled beneath heavily traveled six-lane street
How main was extended under Cleveland's principal traffic artery to serve buildings on other side of avenue; pit 6.5 by 15 ft was excavated at curb line from which 3-ft diam tunnel was started to extend to manhole directly across street, distance of 82 ft; illustrated description. (see also Heating and Vent v 45 n 2 Feb 1948 p 87-8)
City steam line tunneled beneath heavily traveled six-lane street
How main was extended under Cleveland's principal traffic artery to serve buildings on other side of avenue; pit 6.5 by 15 ft was excavated at curb line from which 3-ft diam tunnel was started to extend to manhole directly across street, distance of 82 ft; illustrated description. (see also Heating and Vent v 45 n 2 Feb 1948 p 87-8)
City steam line tunneled beneath heavily traveled six-lane street
Eng News-Rec
Hamlin, G.W. (author)
Engineering News-Record ; 140
1948
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
City steam line tunneled beneath heavily traveled six-lane street
Engineering Index Backfile | 1948
|Reconstruction of old pavements on heavily traveled highways
Engineering Index Backfile | 1942
|Concrete and bituminous macadam used on heavily traveled road
Engineering Index Backfile | 1941
Heavily traveled New Mexico highway repaved with hot-mix asphaltic concrete
Engineering Index Backfile | 1951
|