A platform for research: civil engineering, architecture and urbanism
Genissiat project adds 10% to France's hydroelectric output
First stage of project, which will produce estimated 13 billion kw-hr annually, was officially opened this year; article presents details of reservoir and structures, electric equipment, dam, spillway and discharge tunnel, power plant, intake towers, turbines, generators and transformers.
Genissiat project adds 10% to France's hydroelectric output
First stage of project, which will produce estimated 13 billion kw-hr annually, was officially opened this year; article presents details of reservoir and structures, electric equipment, dam, spillway and discharge tunnel, power plant, intake towers, turbines, generators and transformers.
Genissiat project adds 10% to France's hydroelectric output
Elec Light Power
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
Scouring and dredging at Génissiat
Online Contents | 1994
|Pressure pipes at Genissiat dam, France
Engineering Index Backfile | 1948
Utilization of head of Genissiat on upper Rhone river
Engineering Index Backfile | 1949
|Dam at Genissiat, France, and exploitation of Rhone Rive
Engineering Index Backfile | 1947
|