A platform for research: civil engineering, architecture and urbanism
Foundations for new house of commons
Illustrated data; underpinning was necessary where new pipe subway passes alongside wall, since bottom of subway is about 4 ft below foundation of old wall; where pier had settled, underpinning was performed by two in situ concrete piles.
Foundations for new house of commons
Illustrated data; underpinning was necessary where new pipe subway passes alongside wall, since bottom of subway is about 4 ft below foundation of old wall; where pier had settled, underpinning was performed by two in situ concrete piles.
Foundations for new house of commons
Concrete Constr Engr
1948
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|House foundations: short-bored pile
Engineering Index Backfile | 1952
|House foundations on shrinkable clays
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1896
|Construction of new House of Commons
Engineering Index Backfile | 1949
|