A platform for research: civil engineering, architecture and urbanism
How terteling handled difficult foundation problems at Long Lake dam
Illustrated description of foundation of earth and rock fill Long Lake dam of Columbia Basin irrigation project; data on drilling holes, grouting and pumps; feature of operation was transporting of concrete in open dump trucks over distances up to 13 1/2 mi.
How terteling handled difficult foundation problems at Long Lake dam
Illustrated description of foundation of earth and rock fill Long Lake dam of Columbia Basin irrigation project; data on drilling holes, grouting and pumps; feature of operation was transporting of concrete in open dump trucks over distances up to 13 1/2 mi.
How terteling handled difficult foundation problems at Long Lake dam
Pac Bldr Engr
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficult foundation problems connected with soil stabilization
Engineering Index Backfile | 1966
|Chicago concrete building presents difficult foundation problems
Engineering Index Backfile | 1930
|Difficult foundation problems met during conchas dam construction
Engineering Index Backfile | 1940
|Burlington bridge, near Hamilton, involved difficult foundation problems
Engineering Index Backfile | 1922
|