Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
How terteling handled difficult foundation problems at Long Lake dam
Illustrated description of foundation of earth and rock fill Long Lake dam of Columbia Basin irrigation project; data on drilling holes, grouting and pumps; feature of operation was transporting of concrete in open dump trucks over distances up to 13 1/2 mi.
How terteling handled difficult foundation problems at Long Lake dam
Illustrated description of foundation of earth and rock fill Long Lake dam of Columbia Basin irrigation project; data on drilling holes, grouting and pumps; feature of operation was transporting of concrete in open dump trucks over distances up to 13 1/2 mi.
How terteling handled difficult foundation problems at Long Lake dam
Pac Bldr Engr
1948
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficult foundation problems connected with soil stabilization
Engineering Index Backfile | 1966
|Chicago concrete building presents difficult foundation problems
Engineering Index Backfile | 1930
|Difficult foundation problems met during conchas dam construction
Engineering Index Backfile | 1940
|Burlington bridge, near Hamilton, involved difficult foundation problems
Engineering Index Backfile | 1922
|