A platform for research: civil engineering, architecture and urbanism
Chief Joseph dam
Progress report of $206,000,000 hydroelectric development of Columbia river, Washington; dam of concrete gravity type, 238 ft high; concrete batching, mixing and placing.
Chief Joseph dam
Progress report of $206,000,000 hydroelectric development of Columbia river, Washington; dam of concrete gravity type, 238 ft high; concrete batching, mixing and placing.
Chief Joseph dam
Western Construction
Evans, W.N. (author) / Parker, K.L. (author)
Western Construction ; 27
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
|Preview -- Chief Joseph dam project
Engineering Index Backfile | 1950
Tough tailracing at chief Joseph
Engineering Index Backfile | 1955
|Experimental grouting investigation for Chief Joseph dam
Engineering Index Backfile | 1950
|Stilling basin damage at Chief Joseph dam
Engineering Index Backfile | 1961
|