A platform for research: civil engineering, architecture and urbanism
Power plant in Northern Ontario largely built during winter months
Construction of Upper Notch dam and 13,000 hp. power plant of Northern Ontario Power Co.; cold-weather operations speeded up by wide use of mechanical equipment; channel operations carried on during period of low river flow in mid-winter; power house is integral part of gravity dam, 500 ft. long and 70 ft. high; arrangement of cofferdams and bypass channel; layout of crushing and concrete plant; remote-control for crest gates.
Power plant in Northern Ontario largely built during winter months
Construction of Upper Notch dam and 13,000 hp. power plant of Northern Ontario Power Co.; cold-weather operations speeded up by wide use of mechanical equipment; channel operations carried on during period of low river flow in mid-winter; power house is integral part of gravity dam, 500 ft. long and 70 ft. high; arrangement of cofferdams and bypass channel; layout of crushing and concrete plant; remote-control for crest gates.
Power plant in Northern Ontario largely built during winter months
Eng. News-Rec
Hutchison, D. (author) / Legget, R.F. (author)
Engineering News-Record ; 107
1931
5 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro plant built in 13 months
Engineering Index Backfile | 1951
Keewatin bridge built by Ontario department of northern development
Engineering Index Backfile | 1927
|Florida storm damage confined largely to poorly built structures
Engineering Index Backfile | 1928
|Winter construction in Ontario
Engineering Index Backfile | 1954
|Steel Viaduct built during the winter
Engineering Index Backfile | 1928