A platform for research: civil engineering, architecture and urbanism
Prestressed concrete footbridge on South Bank
Bridge at Festival of Britain is 284 ft long, has deck 3-in. thick at its cantilevered edges and less than 2 ft at center; it is supported on tapered columns, 17 ft high; prestressing procedure; control of concrete; moisture content of aggregate was regularly determined by siphon-can method and amount of added water adjusted accordingly.
Prestressed concrete footbridge on South Bank
Bridge at Festival of Britain is 284 ft long, has deck 3-in. thick at its cantilevered edges and less than 2 ft at center; it is supported on tapered columns, 17 ft high; prestressing procedure; control of concrete; moisture content of aggregate was regularly determined by siphon-can method and amount of added water adjusted accordingly.
Prestressed concrete footbridge on South Bank
Civ Engrs Rev
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete footbridge
Engineering Index Backfile | 1946
Plymouth's new prestressed concrete footbridge
Engineering Index Backfile | 1953
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1951
|