A platform for research: civil engineering, architecture and urbanism
Plymouth's new prestressed concrete footbridge
Footbridge at Whitleigh, Plymouth, 362 ft long and 10 ft wide, consists of series of simply supported and cantilevered spans supported in center on two large frames; floor of bridge consists of T section reinforced concrete fishbelly beams; Freyssinet system of prestressing; bridge was erected with aid of mobile gantry which lifted units directly from truck.
Plymouth's new prestressed concrete footbridge
Footbridge at Whitleigh, Plymouth, 362 ft long and 10 ft wide, consists of series of simply supported and cantilevered spans supported in center on two large frames; floor of bridge consists of T section reinforced concrete fishbelly beams; Freyssinet system of prestressing; bridge was erected with aid of mobile gantry which lifted units directly from truck.
Plymouth's new prestressed concrete footbridge
Surveyor
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete footbridge
Engineering Index Backfile | 1946
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Prestressed concrete footbridge on South Bank
Engineering Index Backfile | 1952
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1951
|