A platform for research: civil engineering, architecture and urbanism
Prestressed concrete footbridge
Brief description of footbridge over tracks at Bully-Grenay, station of French National Railways; each of two, approximately 100-ft, spans comprises two prestressed concrete girders connected by deck slab; saving in weight of steel was about 60% compared with ordinary concrete.
Prestressed concrete footbridge
Brief description of footbridge over tracks at Bully-Grenay, station of French National Railways; each of two, approximately 100-ft, spans comprises two prestressed concrete girders connected by deck slab; saving in weight of steel was about 60% compared with ordinary concrete.
Prestressed concrete footbridge
Concrete Constr Eng
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Plymouth's new prestressed concrete footbridge
Engineering Index Backfile | 1953
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Prestressed concrete footbridge on South Bank
Engineering Index Backfile | 1952
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1951
|