A platform for research: civil engineering, architecture and urbanism
Arch falsework
Of three sets of twin arch concrete ribs longest spans 302 ft, rises 120 ft above bottom of Arroyo and will support deck 100 ft in width; method of lowering scaffolding and centering. See also Engineering Index 1951 p 136.
Arch falsework
Of three sets of twin arch concrete ribs longest spans 302 ft, rises 120 ft above bottom of Arroyo and will support deck 100 ft in width; method of lowering scaffolding and centering. See also Engineering Index 1951 p 136.
Arch falsework
Calif Highways Pub Works
Lendecke, H.R. (author) / Knight, C.H. (author)
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Low-cost falsework for arch bridge
Engineering Index Backfile | 1950
|Movable falsework speeds arch rib construction
Engineering Index Backfile | 1955
|Austrians prefabricate arched falsework for arch bridge
Engineering Index Backfile | 1963
Steel falsework supports forms for multiple-arch bridge
Engineering Index Backfile | 1934
Multiple arch concrete bridge built on timber falsework
Engineering Index Backfile | 1933
|