A platform for research: civil engineering, architecture and urbanism
Movable falsework speeds arch rib construction
1364-ft Colorado Freeway arch bridge over Arroyo Seco in Pasadena consists of three spans of twin arch ribs plus box girder approach spans; movable steel centering for arch ribs; movable falsework, erection and movement of falsework.
Movable falsework speeds arch rib construction
1364-ft Colorado Freeway arch bridge over Arroyo Seco in Pasadena consists of three spans of twin arch ribs plus box girder approach spans; movable steel centering for arch ribs; movable falsework, erection and movement of falsework.
Movable falsework speeds arch rib construction
Am Concrete Inst -- J
Lendecke, H.R. (author) / Knight, Jr., C.H. (author) / Griffin, P.G. (author)
1955
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
|Low-cost falsework for arch bridge
Engineering Index Backfile | 1950
|Dome cost halved by design permitting movable falsework
Engineering Index Backfile | 1956
Austrians prefabricate arched falsework for arch bridge
Engineering Index Backfile | 1963