A platform for research: civil engineering, architecture and urbanism
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wis water works
Intake consists of 300 ft. of piping connecting shore line with suction well in filtration plant, and 1200 ft. of piping from shore line out in Lake Winnebago. It is constructed of 24-in. cast-iron piping.
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wis water works
Intake consists of 300 ft. of piping connecting shore line with suction well in filtration plant, and 1200 ft. of piping from shore line out in Lake Winnebago. It is constructed of 24-in. cast-iron piping.
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wis water works
Cement Eng. News
Jorgensen, T.B. (author)
1919
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1918
|Construction plant and methods employed on new water works intake tunnel at Milwaukee, Wis.
Engineering Index Backfile | 1915
Building Remodeling Construction Method Using Loess Board and Remodeled Building Thereof
European Patent Office | 2020
Building Remodeling Construction Method Using Loess Board and Remodeled Building Thereof
European Patent Office | 2023
|Building Remodeling Construction Method Using Loess Board and Remodeled Building Thereof
European Patent Office | 2019
|