A platform for research: civil engineering, architecture and urbanism
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wisconsin, water works
Detailed description. (1000 w.) (88760 A)
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wisconsin, water works
Detailed description. (1000 w.) (88760 A)
Construction methods employed in building the new intake and remodeled reservoirs of the Oshkosh, Wisconsin, water works
Mun Eng
Jorgensen, T.B. (author)
1918
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1919
|Construction plant and methods employed on new water works intake tunnel at Milwaukee, Wis.
Engineering Index Backfile | 1915
Building Remodeling Construction Method Using Loess Board and Remodeled Building Thereof
European Patent Office | 2020
Building Remodeling Construction Method Using Loess Board and Remodeled Building Thereof
European Patent Office | 2023
|