A platform for research: civil engineering, architecture and urbanism
Method devised by author for dealing with problem presented by irregularities of site; contractors have been invited to inspect models, from which they can take out quantities and prepare tenders for excavation and filling in and building of retaining walls.
Method devised by author for dealing with problem presented by irregularities of site; contractors have been invited to inspect models, from which they can take out quantities and prepare tenders for excavation and filling in and building of retaining walls.
Modelling a factory site
Engineer
Williamson, H. (author)
Engineer ; 146
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Factory & site production - A comparison
British Library Conference Proceedings | 1996
|Off-Site - taking construction into the factory
Online Contents | 2004
In-factory or on-site for concreting
Engineering Index Backfile | 1966
|Concrete pipe factory on a greenfield site
British Library Online Contents | 2009
|