A platform for research: civil engineering, architecture and urbanism
Apr n 4 p 85-90: General outline of scheme; conditions under which work has to be carried out and measures taken to ensure continuity and economy of work; construction of headrace is described in detail. May n 5 p 122-128: Notes on rock excavation; stone crushing and washing plants; bridges, culverts, and siphons; construction of weir and power house; concrete mixing plant; stores and workshops.
Apr n 4 p 85-90: General outline of scheme; conditions under which work has to be carried out and measures taken to ensure continuity and economy of work; construction of headrace is described in detail. May n 5 p 122-128: Notes on rock excavation; stone crushing and washing plants; bridges, culverts, and siphons; construction of weir and power house; concrete mixing plant; stores and workshops.
The Shannon hydro-electric scheme
Eng. Progress
Enzweiler, M.E. (author)
1929
25 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shannon hydro-electric power scheme
Engineering Index Backfile | 1928
Construction works on the shannon hydro-electric scheme
Engineering Index Backfile | 1929
Construction work on the Shannon hydro-electric scheme
Engineering Index Backfile | 1928
River Shannon hydro-electric scheme: Fort Henry embankment, upstream slope failure and remedial work
British Library Conference Proceedings | 2002
|River Shannon hydro-electric scheme: failure of upstream slope of Fort Henry Embankment: Analysis
British Library Conference Proceedings | 2002
|