A platform for research: civil engineering, architecture and urbanism
Construction works on the shannon hydro-electric scheme
Jan n 1 p 49-56: Formwork for draft tubes; order of erection; forms for mass concrete work. Feb n 2 p 131-138: Details of forms for penstock; erecting ribs for penstock forms; formwork for arch of Blackwater siphon; construction of siphon under intake building.
Construction works on the shannon hydro-electric scheme
Jan n 1 p 49-56: Formwork for draft tubes; order of erection; forms for mass concrete work. Feb n 2 p 131-138: Details of forms for penstock; erecting ribs for penstock forms; formwork for arch of Blackwater siphon; construction of siphon under intake building.
Construction works on the shannon hydro-electric scheme
Concrete Constr. Engr
1929
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shannon hydro-electric power scheme
Engineering Index Backfile | 1928
Construction work on the Shannon hydro-electric scheme
Engineering Index Backfile | 1928
The Shannon hydro-electric scheme
Engineering Index Backfile | 1929
|River Shannon hydro-electric scheme: Fort Henry embankment, upstream slope failure and remedial work
British Library Conference Proceedings | 2002
|River Shannon hydro-electric scheme: failure of upstream slope of Fort Henry Embankment: Analysis
British Library Conference Proceedings | 2002
|