A platform for research: civil engineering, architecture and urbanism
Details of concreting plant used in construction of Spitallamm curved, concrete, gravity dam, 110 m. high containing 340,000 cu. m. of concrete; capacity of plant, with 3 cu. m. bucket, is 1500 to 2000 m. in two shifts. (See also V.D.I. Zeit. vol. 73 no. 13, Mar. 30, 1929 pp. 427-431, 13 figs)
Details of concreting plant used in construction of Spitallamm curved, concrete, gravity dam, 110 m. high containing 340,000 cu. m. of concrete; capacity of plant, with 3 cu. m. bucket, is 1500 to 2000 m. in two shifts. (See also V.D.I. Zeit. vol. 73 no. 13, Mar. 30, 1929 pp. 427-431, 13 figs)
Cableway crane with concrete pouring platforms
Kabelkrananlage mit Betongiessbuehne
Rubin, A. (author)
Genie Civil ; 95
1929
3 pages
7 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Cableway crane with concrete pouring platforms
Engineering Index Backfile | 1929
|Aerial cableway platforms on large dam construction sites
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1930
|