A platform for research: civil engineering, architecture and urbanism
Details of concreting plant used in construction of Spitallamm curved, concrete, gravity dam, 110 m. high containing 340,000 cu. m. of concrete; capacity of plant, with 3 cu. m. bucket, is 1500 to 2000 m. in two shifts. (see also translation in Genie Civil, vol. 95, no. 7, Aug. 17, 1929, pp. 145-147, 7 figs)
Details of concreting plant used in construction of Spitallamm curved, concrete, gravity dam, 110 m. high containing 340,000 cu. m. of concrete; capacity of plant, with 3 cu. m. bucket, is 1500 to 2000 m. in two shifts. (see also translation in Genie Civil, vol. 95, no. 7, Aug. 17, 1929, pp. 145-147, 7 figs)
Cableway crane with concrete pouring platforms
Kabelkrananlage mit Betongiessbuehne
Rubin, A. (author)
V.D.I. Zeitschrift ; 73
1929
5 pages
13 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Cableway crane with concrete pouring platforms
Engineering Index Backfile | 1929
|Aerial cableway platforms on large dam construction sites
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1930
|