A platform for research: civil engineering, architecture and urbanism
Glasgow water supply augmented by Glen Finglas intake
Description of new 7.2 mgd intake works consisting of recorder house and operating platform, intake to Loch Katrine, overflow weir, and fish pass; intake weir is 30 ft in length and comes into operation when flow in river exceeds 10 mgd; features of 60 yd long 12 ft diam diversion tunnel and 2 1/3 mi long 8 ft diam tunnel aqueduct.
Glasgow water supply augmented by Glen Finglas intake
Description of new 7.2 mgd intake works consisting of recorder house and operating platform, intake to Loch Katrine, overflow weir, and fish pass; intake weir is 30 ft in length and comes into operation when flow in river exceeds 10 mgd; features of 60 yd long 12 ft diam diversion tunnel and 2 1/3 mi long 8 ft diam tunnel aqueduct.
Glasgow water supply augmented by Glen Finglas intake
Surveyor
Surveyor ; 117
1958
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
Online Contents | 2016
NTIS | 2006
|Engineering Index Backfile | 1957