A platform for research: civil engineering, architecture and urbanism
Use of grouting in underground workings to seal off water flows during development, to consolidate broken country rock prior to blasting, to fill voids behind concrete tunnel lining, to consolidate broken formations during diamond drilling and to seal off heavy water flows from diamond drill holes; application of grouting in Australia; grouting equipment; hazards in mining.
Use of grouting in underground workings to seal off water flows during development, to consolidate broken country rock prior to blasting, to fill voids behind concrete tunnel lining, to consolidate broken formations during diamond drilling and to seal off heavy water flows from diamond drill holes; application of grouting in Australia; grouting equipment; hazards in mining.
Underground grouting practice
Chem Eng Min Rev
Rankin, R.I. (author)
1954
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
|Grouting slurry and underground pipeline grouting method
European Patent Office | 2022
|Underground space consolidation grouting equipment and grouting method thereof
European Patent Office | 2023
|Engineering Index Backfile | 1947
|Underground diaphragm wall composite grouting method and grouting structure
European Patent Office | 2021
|