A platform for research: civil engineering, architecture and urbanism
Grouting solves water problem at Kennecott's deep ruth shaft
Elimination of 10,000 gpm at depth of 520 ft by means of consecutive pouring of two concrete plugs, dewatering of shaft, and grouting; diagrams.
Grouting solves water problem at Kennecott's deep ruth shaft
Elimination of 10,000 gpm at depth of 520 ft by means of consecutive pouring of two concrete plugs, dewatering of shaft, and grouting; diagrams.
Grouting solves water problem at Kennecott's deep ruth shaft
Eng Min J
Huttl, J.B. (author)
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Innovative Grouting Solves Geotechnical Issues: Five Case Histories
British Library Conference Proceedings | 2003
|Shaft-sinking problem overcome by grouting
Engineering Index Backfile | 1956
Deep box section solves connection problem
Engineering Index Backfile | 1960
Deep well solves critical water problem on northern pacific
Engineering Index Backfile | 1941
|