A platform for research: civil engineering, architecture and urbanism
Deep box section solves connection problem
Building of Bethlehem Steel Co, is 250×86 ft in plan and 15 stories high; it features exterior steel columns completely outside building walls; columns are 14 in. beams; 1 ft 8 in. deep steel box girder, framing into column, is haunched to 3 ft depth at joint; connections make use of high strength bolts; construction method also serves research purposes and building is extensively instrumented to record response to earthquakes and heavy winds.
Deep box section solves connection problem
Building of Bethlehem Steel Co, is 250×86 ft in plan and 15 stories high; it features exterior steel columns completely outside building walls; columns are 14 in. beams; 1 ft 8 in. deep steel box girder, framing into column, is haunched to 3 ft depth at joint; connections make use of high strength bolts; construction method also serves research purposes and building is extensively instrumented to record response to earthquakes and heavy winds.
Deep box section solves connection problem
Eng News-Rec
Engineering News-Record ; 165
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1997
Engineering Index Backfile | 1960
Deep well solves critical water problem on northern pacific
Engineering Index Backfile | 1941
|Grouting solves water problem at Kennecott's deep ruth shaft
Engineering Index Backfile | 1953
|New Patcher Solves Pothole Problem
Online Contents | 1993